Installations and maintenance: Construction
Design and construction of meeting office
Design and Installation of an office for meetings inside the General Assembly hall that ensures thermal and acoustic insulation.
Complete design and execution of the camera - 3D measurements
Design and construction of architecture and installations (power supply, lighting, crane 3.2, complete HVAC system, fast doors, emergency lighting)
New constructions
Small buildings, metal structures, aluminum carpentry, PVC carpentry, drums, etc.
Reconditioning and compartmentalization
Interior renovation, plasterboard partitions, epoxy paint for floors, etc.
Design, execution and office partitioning
Quality office design and construction - Magna - 120 minute fire resistance design with own air conditioning and fire detection systems. Partitioning of the main office.
Execution of the concrete platform for logistics - 800 sq m
Design and construction of 800 sqm concrete platform for the logistics department in Heineken Craiova. Installation of a rainwater system with connection to the outlet of the existing system. Installation of traffic protections.
Refurbishment of the cement floor in the warehouse
Epoxy floor application for heavy traffic 800 sqm - Ford Warehouse
Rehabilitation of office and production spaces C19
Design and execution.
Sulfur tank rehabilitation - Heineken
Rehabilitation of a sulfur tank - waste water system - Heineken, by treating concrete and steel reinforcement with Sika solution.
Strengthening the structure with carbon fibers
Consolidation with carbon fibers and accessories, Sika technology, of all support pillars and cracks on the interior floor of the QUALITY building.
Consolidation of the roof structure
Consolidation and reinforcement of the metal structure of the roof, according to Romanian construction standards. Total amount of steel 281 tons.
Consolidation of constructions
Carbon fiber reinforcement, reinforcement of metal structures, etc.
Facades, roofs and skylights
Refurbishment of facades, replacement of asbestos sheets, glass skylights, polycarbonate skylights and window insulation, ventilation grills, etc.
The design and replacement of ventilation grids
The design and replacement of 420 square meters of ventilation grids on the technical floor to make the system work more efficiently on the technical floor of the Dyeing department.
Replacement of roof secured glass
Design, calculation and execution for the solution to heat loss: by reducing hall roofs - Trim & Final Shop by replacing safety glass with 16 mm polycarbonate 6 / 16-20.
Implementation of fire prevention systems
The design and execution of: sprinklers, flame-retardant and fire-resistant electrical structures, casings and lightning protection systems.