Office for meetings
Design and Installation of an office for meetings inside the General Assembly hall that ensures thermal and acoustic insulation.
Installation of air diffusers
The supply and installation of 167 pieces of air diffusers in the Bodywork section, for the proper heating and ventilation of the production space.
Purchase and Installation of Air Curtains
Purchase and installation of air curtain systems 36KW / piece - in the Magna logistics area. The automatic systems were installed for the two fast access doors.
Air management systems
Air conditioning, ventilation and extraction, air pressurization, etc.
Industrial cooling systems
Cooling cabin parts
Modification of the body cooling system
Increasing the suction capacity by changing the piping routes and increasing the capacity of the fans.